401Slab-on-gradeElectrical and plumbing

Slab-on-Grade Support with Loop

Slab-on-grade support with an integrated loop: secures the pipe prior to rebar and holds it at elevation through the pour.

Give us the size, drop and service and we’ll spec the part number and quote the build.

In use

In use.

Function

Pre-pour
Temporary securement device: positions and secures the utility before and during the concrete pour.
No rating
No load rating is published; the cured concrete carries the utility.

The cured concrete carries the utility.

Custom order

Specify the size

Custom made per order.

Slab-on-Grade Support with Loop with callouts

Height: 12, 18 or 24 in. (XX other)

Hole ID: 1.25 / 1.50 / 1.75 / 2.00 / 2.25 / 2.50 in. (XX other); order a larger hole ID to pass couplings

Part number401A__B__Finish the selections to complete the request.

03 · Notes

From the Technical Data Sheet

  • Slab-on-grade support with an integrated loop: secures the pipe prior to rebar and holds it at elevation through the pour.
  • Work safe: the installer secures pipes in place prior to rebar.
  • Galvanized rod; corrosion resistant.
  • Designed for demanding high-rise construction.
  • Integrated loop secures the pipe without extra ties, speeding up installation.
  • Electrical and plumbing: positions PVC conduit, PVC-coated GRC, ENT and PVC- jacketed MC (NEC 352.30, 344.30, 362.30, 330.30) and sleeved PEX (IPC 305, UPC 312.2) in the pour, secured so they cannot float, shift or separate at joints; spacing per the specifications and the manufacturer.
  • Drawings not to scale.

Send the spec. We’ll build the support.

Size, drop, and service. We’ll spec the part number and quote the build.