CPLEnd fixing10/bag · 5/bag at 35′

Cast-in-place loop

Concrete is tough!

A swaged loop set into the deck before the pour, so the hanging point is in the concrete rather than fastened to it after the fact.

Assemblies ship individually wrapped and color coded by size, so a box of thirty does not arrive as a tangled mess. Sold 10/bag through 20′ and 5/bag at 35′.

Give us the size, drop and service and we’ll spec the part number and price the build.

CPL cast-in-place loop on a cable

Swaged loop, cast into the pour.

Rated capacity

175 lbs
#2, 3/32″ cable, vertical (PMG-1840)
320 lbs
#3, 1/8″ cable, vertical (PMG-1840)
Cast in
Set before the pour, no post-installed fastener
ICC-ES PMG mark of conformityQR code linking to ICC-ES PMG listing PMG-1840ICC-ES Evaluated
PMG-1840

Manufactured to ASTM A1023 and ASTM A931. ICC-ES Evaluated under listing PMG-1840, Hangers for Pipe, Duct and Conduit Support, to ICC-ES LC1041 and MSS SP-163-2025. Rated loads are for the support assembly only, at a 4:1 factor of safety; attachment to structure is evaluated separately by the design professional or the authority having jurisdiction. Dry locations only, not for fire-protection piping.

Allowable tension load

Capacities from the Technical Data Sheet

Allowable tension loads per Technical Data Sheet R0.1. The cable capacities match PMG-1840 Table 1.

Cast-in-Place Loop, CPL: allowable tension load in lbs
CableCable capacity
#2, 3/32″175
#3, 1/8″320

Cast into the pour. No post-installed anchor required. Connection to structure must be reviewed by the structural engineer of record.

Tech data sheet CPL, R0.1 (PDF)

Part numbers

Read the callout

Assemblies are sold 10/bag through 20′ and 5/bag at 35′. Devices are ordered separately unless you ask for them packed with the assembly.

SC
Swaged cable
02
#2, 3/32″
12
12′ length
CPL
Cast-in-place loop

Add X2 or X3 at the end of the part number for double or triple tie cables. Many other options are available. Just let us know and we will get you specifically what works for your job!

Cast-in-Place Loop, CPL
Part numberDescriptionCableLengthPack
SC0206CPL3/32″ Cable, 6′, Cast-in-Place Loop#26′10/bag
SC0212CPL3/32″ Cable, 12′, Cast-in-Place Loop#212′10/bag
SC0220CPL3/32″ Cable, 20′, Cast-in-Place Loop#220′10/bag
SC0235CPL3/32″ Cable, 35′, Cast-in-Place Loop#235′5/bag
SC0306CPL1/8″ Cable, 6′, Cast-in-Place Loop#36′10/bag
SC0312CPL1/8″ Cable, 12′, Cast-in-Place Loop#312′10/bag
SC0320CPL1/8″ Cable, 20′, Cast-in-Place Loop#320′10/bag
SC0335CPL1/8″ Cable, 35′, Cast-in-Place Loop#335′5/bag

Before you install

Limits that apply on every job

Follow capacity limits

Never overload SSF Cable Assemblies. Refer to the Technical Data Sheets for complete assembly capacities.

Take angle reductions

Assemblies not installed vertically take the published angle reduction, applied to the assembly rating. When cable is looped around round duct, the resulting angle shall not exceed 60°. Y-Accessories and Y-Assemblies may not be installed at angles greater than 60°.

Never join two cables

Never join 2 cables into a single device. Voids engineering and warranty.

Do not use for lifting

Static overhead support only. Not for lifting, rigging, or fall protection.

Dry indoor use only

Not for wet, chlorinated, or otherwise corrosive environments. Use SSF cable only; plastic-coated and third-party cables are not permitted with SSF devices.

Do not paint cables. Keep cables clean.

Install in final position before painting. Devices cannot be adjusted after paint contacts the cable. Cables must be free of oil and fireproofing prior to device installation.

Send the spec. We’ll build the support.

Size, drop, and service. We’ll spec the part number and price the build.